Article I. Safeguards During Construction  


§ 13-124-010. Construction safeguards – Specifications.
§ 13-124-015. Notice of demolition.
§ 13-124-020. Construction loads.
§ 13-124-030. Reserved.
§ 13-124-040. Protection of floor openings.
§ 13-124-050. Temporary flooring.
§ 13-124-060. Demolition – Regulations.
§ 13-124-070. Demolition – Notification of commissioner.
§ 13-124-080. Demolition – Procedure.
§ 13-124-081. Posting of sign required.
§ 13-124-090. Wrecking operations – Time limitations.
§ 13-124-100. Filling and grading of openings.
§ 13-124-110. Debris removal.
§ 13-124-120. Temporary structures – Reflective material required.
§ 13-124-130. Walkways, barricades and fences – Generally.
§ 13-124-140. 13-124-170 Reserved.
§ 13-124-180. Walkways and temporary sidewalks – Construction requirements.
§ 13-124-190. Roofs and skylights of adjoining buildings.
§ 13-124-200. Anchorage of party walls.
§ 13-124-210. Material and personnel hoists.
§ 13-124-220. Material and personnel hoists – Erection drawings.
§ 13-124-230. Material and personnel hoists – Manufacturer's specifications.
§ 13-124-240. Material and personnel hoists – Warnings and instructions to be displayed.
§ 13-124-250. Material and personnel hoists – Endless-belt type manlifts.
§ 13-124-260. Material and personnel hoists – Wind velocity.
§ 13-124-270. Material and personnel hoists – Exposure to high winds – Inspection before reuse.
§ 13-124-280. Compliance with electrical code.
§ 13-124-290. Material hoist standards.
§ 13-124-300. Personnel hoist standards.